_______________ MRP is an MRP system that includes production planning, master production scheduling, and capacity requirements planning.


A) Fully-integrated
B) Closed-loop
C) Open-loop
D) Wide-range
E) Enterprise

F) A) and B)
G) B) and C)

Correct Answer

verifed

verified

_________________ uses planned order releases from the MRP, which considers beginning inventory.

Correct Answer

verifed

verified

CRP (Capac...

View Answer

_______________ assumes that we make enough of everything to build the required quantity, ignoring beginning inventory.

Correct Answer

verifed

verified

RCCP (Roug...

View Answer

Which ERP module includes work-flow analysis?


A) finance and accounting
B) information systems
C) sales and marketing
D) production and materials management
E) human resources

F) A) and D)
G) C) and D)

Correct Answer

verifed

verified

Information that may be contained in the inventory records file includes all except which of the following?


A) part numbers
B) run times for manufactured parts
C) part names
D) lead times
E) safety stock requirements

F) D) and E)
G) A) and E)

Correct Answer

verifed

verified

Scheduled receipts are replenishment orders that have been placed but not yet received.

A) True
B) False

Correct Answer

verifed

verified

An error in replenishment ordering can result from a(n) _____________________________.


A) inaccuracy in the inventory records file
B) breakdown of equipment
C) expediting of an order
D) circumstance of working excessive overtime
E) error in accounts receivables

F) C) and D)
G) D) and E)

Correct Answer

verifed

verified

When there is insufficient inventory to satisfy the forecast for a particular period a(n) _____________ order must be placed.


A) BOM
B) restock
C) inventory request
D) MPS
E) MRP

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

Which of the following is not true concerning indented bills of materials?


A) Subsequent levels are indented further to the right.
B) Children are indented toward the right.
C) The highest level parents are closest to the left margin.
D) Quantity required is shown for each part number.
E) Lead times determine how far children are indented.

F) C) and D)
G) C) and E)

Correct Answer

verifed

verified

The authorized MPS is a statement of what the company expects to build and when it expects to build it.

A) True
B) False

Correct Answer

verifed

verified

The cumulative lead time is _______________________________.


A) the sum of the lead times for all the components
B) the sum of the lead time and the safety time
C) the number of time buckets used in the MRP
D) the longest route in terms of time from the low level items to the end item in the product structure tree
E) lead time less the safety time

F) B) and E)
G) None of the above

Correct Answer

verifed

verified

Supply chain intelligence enables strategic decision-making along the supply chain.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not a lot size rule?


A) lot for lot
B) fixed order quantity
C) overall factors
D) least total costs
E) parts period balancing

F) D) and E)
G) A) and E)

Correct Answer

verifed

verified

In the mid-1970s, MRPII was developed. One of its major components is:


A) leadership
B) inventory management
C) operations execution
D) strategic management
E) marketing

F) A) and B)
G) C) and D)

Correct Answer

verifed

verified

What proportion of U.S. companies with greater than $1 billion in annual revenues has implemented ERP?


A) 10%
B) 20%
C) 40%
D) 75%
E) 95%

F) D) and E)
G) C) and D)

Correct Answer

verifed

verified

The lead time can be less than the cumulative lead time when the company has inventory on hand.

A) True
B) False

Correct Answer

verifed

verified

ERP modules are fully integrated.

A) True
B) False

Correct Answer

verifed

verified

Dell practices _____________________________.


A) focused customization
B) make to stock production
C) mass merchandising
D) mass customization
E) frozen assembly schedules

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified

For every scheduled receipt in an MRP table, there is also in the organization a(n) __________________.


A) shop floor order
B) order that has been placed but not yet been received
C) planned order
D) period order
E) dispatch list

F) A) and B)
G) C) and E)

Correct Answer

verifed

verified

The authorized MPS is a statement of ______________________________.


A) manufacturing orders that have been authorized for release to the shop floor
B) which workers are authorized to work on which machines
C) what the company expects to build and when it expects to build it
D) authorized payments to vendors
E) where different end products are authorized to be manufactured

F) A) and C)
G) A) and B)

Correct Answer

verifed

verified